Back to Results

City of Calgary Emergency Operations Centre

  • City-of-Calgary-Emergency-Operations-Centre_dusk
  • City-of-Calgary-Emergency-Operations-Centre_night
  • City-of-Calgary-Emergency-Operations-Centre_glass wall
  • City-of-Calgary-Emergency-Operations-Centre_inside view
Location:
Calgary, AB
Building Structure Type:
Fire Stations / Emergency Operations
Owner/Developer:
City of Calgary
Architect:
Manasc Isaac Architects
Contractor:
BIRD Construction
Number of Storeys:
3
Size:
53,000 sq. ft.
Practice areas

As Calgary’s multi-agency command centre, key personnel from the City’s business units and various external agencies work from the EOC to maintain city services throughout an emergency or natural disaster. The facility is designed to operate as a self-contained facility for the critical first 72 hours of an emergency. The majority of the Centre is below ground, reducing the amount of above-grade building mass, increasing security and reducing heat requirements. Certified LEED® Gold, the carbon footprint of the main structure was reduced by using concrete with high cement replacement by recycled materials and all structural steel and concrete reinforcing were specified to contain a high amount of recycled content.

The building is designed to have a very long lifespan and future changes in the use of the building will not be limited by the structure. A regular column grid, coupled with demountable interior partitions allows for future flexibility with minimal waste due to renovations. Higher live load capacities at all levels create a structure that can easily accommodate a variety of uses and changes over its lifetime.

LEED® Gold certified

  • Award of Merit  |  Consulting Engineers of Alberta  |  2014
  • Award of Excellence – Buildings  American Concrete Institute  |  2013
  • Institutional  |  Alberta’s Top Construction Projects  |  2012