The pedestrian overpass at 61st Avenue and Macleod Trail SW is a long anticipated connection across Macleod Trail with an extension directly into the second floor of Chinook Centre.
The primary objectives of the project are to provide improved connectivity between adjoining properties, alleviate traffic congestion, and provide a safer, more inviting crossing over Macleod Trail.The Chinook overpass exists within the greater context of a Station Area Plan, which includes revised land use, provisions for a new multimodal transportation network, and an upgraded retail high street between the Chinook LRT station and Chinook Centre.
RJC, as Prime Consultant on the project, developed multiple bridge alignments, access structure options and unique span configurations.