GeoSolv Design/Build | June 1, 2022
Andrew Bayne, BESc, BSc, P.Eng., LEED® AP | Principal

In the tremendously busy Greater Toronto Area construction industry, design consultants are often asked to provide design proposals in short order for developments that are based on limited information, minimal reporting, and only a handful of vague assumptions, ahead of ever being able to get their feet wet in the schematic design phase of the project.   

 Read Publication Back to Published Items