Daily Commercial News, ConstructConnect | December 2018
Tim Van Zwol, BASc, MSc, P.Eng. | Associate

Rather than throwing away the canvas or, in this case, demolishing the building, a design team headed by RJC Engineers came you with an innovative lateral force-resisting system that enabled the courthouse to continue operating during a sequenced seismic upgrade.

Read Publication Back to Published Items