The City needed the Operations Centre to be flexible for future change and expansion.
RJC designed the building’s gravity and lateral systems to accommodate a future upper-floor expansion at the east end of the building.Loadbearing masonry walls typify the main level of the building, they were primarily chosen for economy and durability.
The upper level has long floor spans in excess of 8m, to achieve these spans and for economy a ComSlab floor system was chosen.